Western
Guilford High School
Greensboro, North Carolina
The
design of the new addition integrates different components of the campus
by introducing new circulation patterns. A new entry gallery at the front
entry to the school was designed; along with art and classroom additions
form an internal courtyard. The addition consists of four basic elements:
Classroom addition to the vocational building, a cafeteria expansion and
gym, a 2 story classroom addition and a single story art addition. It
was imperative that a future bond pass public vote for construction to
proceed. Our firmÕs involvements and communication with the community
generated enthusiasm for construction. The bond passed public vote and
the project was completed in September 2002.